Flushing and Chemical Treatment Service

Chilled water flushing is an essential process in HVAC systems to remove contaminants, rust, scale, and suspended particles from the piping network before system operation.
When planning an HVAC project, selecting the right chilled water flushing contractor is an important decision.
Whether you are an MEP contractor, project consultant, or facility owner, understanding the scope, equipment, pricing, and technical requirements will help you select the right service provider.
How Much Does Chilled Water Flushing Cost?
The cost of a chilled water flushing and chemical treatment service project depends on several factors, including:
Total system water volume (m³).
Number of buildings and flushing circuits.
Pipe diameters and network configuration.
Required pump capacity and rental duration.
Chemical cleaning and treatment requirements.
Filtration equipment and filter elements.
Water supply and disposal arrangements.
Project location and accessibility.
For this reason, there is no fixed price per cubic meter that applies to every project. A proper quotation should be prepared after reviewing the project drawings, BOQ, and technical requirements.
What Information Is Required to Receive a Flushing and chemical treatment service Quotation (RFQ)?
To prepare an accurate commercial and technical proposal, the following information is typically required:
Project name and location.
Approved HVAC or CHW drawings (AutoCAD).
BOQ and project specifications.
Total estimated system water volume.
Number of buildings and independent circuits.
Pipe diameters and main header sizes.
Number of chillers, pumps, AHUs, and FCUs.
Required flushing velocity.
Project schedule and expected mobilization date.
If some information is unavailable, a site visit can help assess the system and identify the missing details.
How Many Pumps Are Required for a CHW Flushing Project?
The number and capacity of pumps depend on the system configuration, pipe diameters, required flow rate, and hydraulic resistance.
Engineer should calculate the required flow rate based on the target water velocity and pipe internal diameter.
For example, achieving a water velocity of 2 m/s in a 100 mm internal diameter pipe requires approximately 56.5 m³/h: (Q=A*V)
Large projects may require multiple high-capacity pumps operating in parallel or dedicated flushing arrangements for different circuits.
The final pump selection should also consider the required head, pressure losses, and actual pump performance curve.
How Long Does a Flushing Project Take?
The project duration depends on:
Total system volume.
Number of buildings and circuits.
Available pump capacity.
Pipe diameters.
Contamination level.
Chemical treatment duration.
Water availability.
Site readiness and access.
5. Is Temporary Bypass Installation Included?
Temporary bypass arrangements are necessary to isolate chillers, pumps, control valves, or other sensitive equipment during flushing.
However, bypass requirements differ according to the system design.
Before awarding the contract, clarify:
Which equipment requires bypassing?
Who will supply the bypass materials?
Who is responsible for installation and removal?
Are permanent modifications excluded?
Are all connections and isolation valves accessible?
These details should be clearly stated in the responsibility matrix and quotation.
What Documents Will Be Provided After Project Completion?
After complete the flushing and chemical treatment works, the following should be provided:
Flushing and chemical treatment records.
Water sampling results.
Final laboratory report.
Completion documentation.
The acceptance criteria should be agreed with the client and consultant before starting the project.
Is a flushing report provided after completing the work?
Yes. A flushing report is typically prepared after completing the flushing and chemical treatment activities. It documents the work performed, flushing procedures, filtration stages, chemical treatment records, water sampling results, laboratory analysis, and final water quality in accordance with the project requirements and agreed acceptance criteria.
How Can I Choose a BSRIA-Compliant Flushing Contractor?
When comparing flushing companies, do not focus only on the quotation price.
Evaluate their:
Previous project experience.
Engineering and technical capabilities.
Availability of Pumping and filtration equipment.
Type of Chemicals to be used.
Understanding of BSRIA BG 29:2020.
Laboratory testing arrangements.
Filtration Unit
What is a filtration unit, and why is it used during chilled water flushing?
A filtration unit is used during chilled water flushing to remove suspended solids, rust, scale, and other contaminants from the circulating water. It consists of filter elements with different micron ratings, selected according to the required filtration efficiency and flow rate.
Filtration elements are available in various micron ratings, such as 100, 50, 25, 10, 5, 1, and 0.5 microns. Multi-stage filtration systems can combine different ratings to progressively remove particles of different sizes and improve water cleanliness.
The filtration unit capacity and configuration are selected based on several factors, including:
Total system water volume (m³).
Required filtration flow rate (m³/h).
Largest pipe diameter in the network.
Pipe network configuration.
Expected contamination level.
Required micron ratings and number of filtration stages.
Project specifications.